EPC of MW Solar Power Plants

Four Solar can install and commission EPC projects in about 5 months from the date of PO. We take the responsibility to liaison with required departments for permissions. The cost of the project varies based on the quality parameters and operational efficiencies. The government of India encourages investors / industries to setup solar power plants by taking advantage of

  • 80% Accelerated Depreciation (AD) and get faster RoI
  • Check with your CA regarding latest update on 10 year tax holiday (section 80 IA)

The solar power plant setup is an art by itself. It needs proper planning and skilled execution. Four Solar has experience in EPC of solar power projects.

The Planning Stage includes:

  • Assessment of ground conditions
  • Feasibility study
  • Ownership and Legalities
  • Specs preparation
  • Draft Agreement

The Execution Stage includes:

  • Start procurement and manage logistics
  • Prepare the surface
  • Install panel mounting structures
  • Install inverters and panels
  • Manage project
  • Test efficiency
  • Document
  • Approval

Four Solar has able advisors and expert engineers who are committed to excellence. We will work for success of your solar power plant.